Signs you need it
- A lower-level finish is planned, including a full or half bath
- Your house has capped rough-in stubs that do not match your planned layout
- A secondary suite or in-law space requires its own washroom
- An old basement shower drain sits in the wrong spot or has failed
How we do the work
- Plan the layout. We work from your drawings to confirm fixture positions, drain sizes and venting routes.
- Check the depth. We establish how deep the existing building drain sits, because gravity drainage depends on it.
- Cut and trench. We saw the concrete along each drain path and dig out the trench.
- Lay and slope the pipe. Drain lines are set at proper fall and tied into the main with approved fittings.
- Vent the fixtures. Each trap needs venting, either to an existing stack or a new one through the house.
- Test before backfill. The system is tested and made ready for inspection before concrete is patched.
Mississauga homes and this job
Many houses built across the city from the late 1980s onward came with capped rough-in stubs for a future basement bath. Those stubs save trenching, but builders often placed them where nobody would design a bathroom today. Older homes rarely have them, and some have a building drain too shallow for gravity flow, in which case a sewage ejector or upflush system is the answer. Because basement fixtures sit lowest in the house, they are the first to show a sewer backup, so we often discuss a backwater valve during the same project. Upstairs fixture work is covered by bathroom renovation plumbing.
Working with your contractor
Many basement projects involve a general contractor or a carpenter handling the framing and finishes. The rough-in fits best when we are involved early, ideally before the floor plan is fixed. Small adjustments to fixture positions can avoid a second stack or a long trench. We supply measurements for drain centres and supply heights so framers and tile setters know exactly where everything sits. Coordinating early also helps with permit drawings, because the plumbing layout shown on the application should match what is eventually built. Changes made after approval can mean revised drawings and an additional inspection.
What affects the cost
- Whether existing stubs can be used as placed
- Length of trenching and amount of slab to cut
- Venting route and whether a new stack is required
- Need for an ejector pump where gravity drainage is not possible
- Adding supply lines, a new shut-off or a softener while walls are open
The job, tool by tool
Tools on the truck for sink, faucet and shower work
- Basin wrench
- Reaching faucet nuts behind the sink
- Cartridge pullers and seat wrenches
- Rebuilding shower and faucet valves
- Tubular trap kits
- Re-plumbing sink drains and arms
- Inspection mirror and torch
- Spotting slow drips under cabinets
On every job
- Drop cloths down before any tool comes out
- Water or fuel shut and tagged while we work
- Every joint we made checked dry before we pack up
- Old parts shown to you, then hauled away
A call-out, start to finish
- 1Call and describe the fixture, floor and symptom
- 2We arrive, lay drop cloths and shut the water where needed
- 3Trap pulled, line cabled or camera run to find the cause
- 4Fix explained, then cut, joined or replaced
- 5Water run through, joints checked, written note left
Answers our Mississauga crew gives most
Does a basement bathroom need a permit?
Usually. The City of Mississauga's building division can confirm what your project requires.
What if my drain is too shallow?
A sewage ejector pit or an upflush toilet system can lift waste to the main drain.
Can the rough-in be done before the framing?
Yes. Under-slab work should be done and inspected before floors and walls go in.